Main stages of repair works in the apartment.
How to begin repair works of the apartment?
The first phase of the repair of old houses is the destruction and dismantling first off of the dilapidated walls and partition walls, eliminating the wall and ceiling finishing. This stage is among the most "dirty" stages of the repair.
One more amongst the most crucial and "dirty" works is the window block replacement. It is required to do this to start with since dirt and dust will be unallowable during following phases and it is restricted at all to open windows during painting and wallpaper works (large drops of the temperature and wetness are unallowable). After installing windows and windowsills it is required to load them right away in polyethylene film and to cover windowsills in addition by the fiber board (in order to avoid scratches).
The following phase is electrical wiring. Circuitry can be installed in walls or along the floor. Wiring is made water-saving plumbing tips inside the pipes to make sure electrical safety and boost reliability. The pipe safeguards circuitry from external damages and enables to change the wire totally without breaking walls and flooring just by placing the brand-new wire rather of the old one.
House Painting follows the wiring. The regular mistake during the synchronised conducting of such works occurs when workers forget to lay out one of the cables and house painters have actually currently plastered and smoothed out the wall. As a result, additional works are necessary to seal chases after on the completed wall. The locations of the feed switch and wall outlet area and their number should be thought-out beforehand. The plan of power circuitry is normally consisted of into the design project.
Later on the system need to be prepared to service in case of failures. In addition to the wirings, the telephone cable television and the television cable television are set out. The power cable need to not be laid out near the telephone and antenna cables to prevent noise pickup and interference. The most strange minute is setting out the TV cable. In order to make 2 (or three) television set in the house the second cable television is frequently merely "firmly soldered" in parallel, so the cable resistance is lowered. As a result, the display screen quality is deteriorated, many programs can't be received and etc. In order to avoid such scenario it is necessary to welcome a professional with special devices. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.
Painting is the most long-term process, that is why it is carried out at the same time in all premises, if it is possible. Hold-ups are linked with the technology. Each used layer of the plaster (or completing completing) need to dry totally before the work will continue.
Works in sanitary arrangements and the cooking area begin concurrently with house painting. It is better to meet so-called "filthy" works in the first place and all at once. In accordance with the strategy of the sanitary specialist location welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.
Then operates in sanitary arrangements are carried out according to the strategy. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The following phase is assembling ceiling and laying tiles on the flooring. And at last other hygienic gadgets, mixers and devices are mounted.

The following phase is the procedure of fill. Fill can be made with different products-- from usual masonry cement-sand mixture to self-aligning floors. The benefit of the simple mixture is its cheapness, the drawback is that such mixture is much more difficult aligned at the level and the final dry time of such fill is 40 days, just then the next phase of the deal with floor can be carried out, i.e. the period is too long. Self-leveling self-aligning floors are much more costly, but more technological. Aligning takes place practically "automatically" i.e. fluid solution of mixture is poured out, then it runs and you get the horizontal surface area. The final dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is installed into the fill. If the so-called "wet procedures" are inapplicable the innovation of the dry aligning (the fill technology) is used bases for floorings with adjustable floor battens are mounted.
After fill door boxes and door are installed. Setup of doors must take into the account density of future flooring covering. After installation the door can be taken off its hinges and eliminated up until the end of repair or loaded into polyethylene movie to safeguard from damages. Concurrently ceiling can be painted and the tile can be laid in that premises where it was planned. The tile must be laid on the absolutely dry overlay.
Finishing of the floor mounting depends upon the planned covering. For the most part (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the flooring by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close fixing of plywood and long-term service of the floor without squeak and bulging. The plywood provides the additional heat- and acoustic insulation. After installing of the plywood is ended up, wallpaper for painting can be pasted on walls.
In properties where surface covering of the floor is laminated flooring or parquet hoard, the normal wallpapers are pasted (not for painting) in the very first place. Then the flooring covering is mounted.
If surface covering of the floor is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The pointed out repercussion is connected just with such rushing process when the fantastic quantity of dust is developed. In spite of the truth that excellent flooring mills are geared up with the vacuum cleaner, the sufficient amount of dust is precipitated on surrounding subjects consisting of walls. Dust is really acerbic and is severely washed off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not soak up the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be thought about to be completed. It is left only to set up the plinths, ornamental components, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is required to note that the series of works was noted in general and can alter depending upon the definite situation-- the number of rooms in premise, your resources, peculiarities of the construction of the multilevel properties. It is based upon sound judgment and every person capable of analysis can independently develop such a series.